A state-of-the-art 850,000 sq ft temperature-controlled distribution facility featuring multi-zone storage capabilities and advanced automation systems.




Comprehensive site analysis, architectural design, and regulatory approval process including environmental impact assessments and local permitting.
Excavation, utility installation, and concrete foundation work including specialized footings for heavy refrigeration equipment and automated systems.
Steel frame erection, insulated panel installation, and roofing systems with specialized thermal barriers for temperature-controlled environments.
Installation of refrigeration systems, electrical infrastructure, and automated storage equipment with comprehensive testing and commissioning.
System validation, performance testing, staff training, and facility handover with comprehensive documentation and warranty coverage.
Get detailed insights into the Costco Distribution Center project including specifications, timeline, and key achievements. Enter your email to receive the comprehensive project brief.

Comprehensive 24-page project overview including design specifications, construction timeline, and performance metrics from this award-winning cold storage facility.
Enter your email address to receive the project brief instantly.
By downloading, you agree to receive occasional updates about similar projects. Unsubscribe anytime.
"Span Construction delivered an exceptional facility that exceeded our expectations. Their attention to detail in the temperature control systems and automation integration was outstanding. The project was completed ahead of schedule with zero safety incidents."

"The level of coordination and communication throughout this complex project was remarkable. Span's team worked seamlessly with our operations to ensure minimal disruption to our existing facilities while delivering a world-class distribution center."
Experience the same level of excellence and attention to detail that made the Costco Distribution Center a success story.